Original link: https://www.skyue.com/23082708.html
1. Interview
In July, a reporter from the City Secret Official Account contacted me through my blog. At that time, she was writing an article about the Liangzhu Cultural Village. She saw several articles about the Cultural Village in my blog and wanted to talk to me about culture. village life. I have never chatted with a reporter in this way of interview, and I was very curious, so I found a weekend and chatted for two hours at the newly opened Manner Cafe in Yuniaoji . The manuscript was sent out in early August ( instructions on life in Liangzhu: “Next to Tadao Ando’s building, a place like Kichijoji” ). In fact, I made very little contribution to the manuscript.
When they asked me out, they said there was a tip, but I said no, it was no trouble to chat at the door of the house, and then I didn’t care. Unexpectedly, shortly after the article was published, the other party contacted me and said that they would pay me a tip, and emphasized that the company would reimburse me, so don’t be embarrassed. It would be disrespectful to refuse again, so I received the first interview tip in my life.
A very special experience.
Two, physical examination
I made an appointment for a physical examination on Friday, but I didn’t sleep well the night before. I was a little nervous for some reason. It may be affected by family affairs , or you may worry about various minor problems exposed on your body when you get older.
Two more discoveries:
1. There are very few physical examination items, and it can be seen that the company saves costs, which have already been saved on employee physical examinations.
2. Rich’s queuing system is really good. Each item may be queued for a short while, and the overall time may not be reduced, but because there is no particularly long queue, it gives people a good psychological feeling.
I experienced it in a public hospital last year, queuing was very painful, and I wrote an article for this.
Ruici’s method is: every time a customer completes a project, the system will automatically assign the next project according to the current queuing situation of each project. The customer has no right to choose and can only come one by one according to the assignment.
It’s centralized and really efficient.
This article is transferred from: https://www.skyue.com/23082708.html
This site is only for collection, and the copyright belongs to the original author.